Projects Portofolio

RESIDENTIAL:

Complex comprising 100 apartments spread across blocks A, B, C, D & E, each with ground, first floor; typical 2nd to 10th floors, 11th and 12th floors. The development has a common ground floor parking which also includes the management office. Other common floors are the basement levels 1 and 2 which have parking spaces and future office expansion areas and management stores. Outer buildings include the pool plant house and the guard/gate house and transformer room and generator rooms.

Provided comprehensive MEP services including:

  • Small power and lighting fittings.
  • Medium voltage switchboard and Voltage Stabilizer
  • Power Distribution Installation
  • CCTV Installation
  • Access Control System
  • Fire detection and alarm system
  • Fire Detection and Alarm Systems
  • Structured cabling installation
  • Lifts installation for each block
  • Building Management System (BMS) installation
  • Security surveillance systems
  • Plumbing, drainage and ventilation installation

Comprises 4 No. blocks of two- and three-bedroom apartment. Other features include standby generator for entire facility, borehole, and solar water heating, master antennae TV system and are internet ready wired

Provided comprehensive MEP services including:

  • Power and lighting installation.
  • External lighting.
  • Meter box.
  • Power Distribution.
  • Structured Cabling Installation.
  • Generator Installation
  • MATV System
  • Plumbing and drainage
  • Construction of 500 low-income houses comprising bungalows, maissonnets and flats. Works include.

    Provided comprehensive MEP services including:

  • Power and lighting
  • Structured cabling installation
  • Street lighting

  • 4 No. ultra-modern town houses in a gated community in Lavington area of Nairobi.

    Provided comprehensive MEP services.

  • Upmarket apartment block located at the junction of Ole Odume road and Diani Close in Nairobi-Kenya.

    Comprises the following:

  • Basement for car parking, guard house, gym and swimming pool.
  • Ground, first and second floors comprising houses type A, B, C, D & E. The houses comprise two bedrooms (all ensuite) and a master ensuite, lounge, dining kitchen dhobi area and Domestic Servant Quarter (DSQ).
  • Penthouse duplexes above second floor comprising lower and upper sections. The duplexes are classified into types A, B, C, D & E.
  • Provided comprehensive MEP services including:

  • Power and lighting installation.
  • External lighting.
  • Meter box.
  • Power Distribution.
  • Backup generator for essential services
  • Plumbing and drainage

  • 70 No. apartments comprising 3 bedroom and 40 No. 2 bedroom apartments including a commercial center.

    All apartments are in 4 storey flats.

    Provided comprehensive MEP services



    COMMERCIALS (NEW FACILITIES):

    Comprises show room, parts sales and workshops and include office block on ground and first floor. Ground floor houses customer lounge and parts warehouse, while first floor houses offices, server room and staff cafeteria. Washrooms are contained both on ground and first floors. Service workshop is adjacent to ground floor office space and is to be used for servicing of vehicles. Other spaces include ample parking space and out buildings comprising transformer/switch room and guard room.

    Salient features:

  • Small power and lighting fittings.
  • Medium voltage switchboard and Voltage Stabilizer
  • Power Distribution Installation
  • CCTV Installation
  • Access Control System
  • Fire detection and alarm system
  • Structured cabling installation
  • Uninterruptible Power System (UPS)
  • Plumbing, drainage, and ventilation
  • Facility comprising office block with ground floor for showroom, offices and parts store. First floor accommodates additional offices, server room and cafeteria. Adjacent to office block is workshop for service and maintenance of vehicles.

  • Small power and lighting fittings.
  • Medium voltage switchboard and Voltage Stabilizer
  • Power Distribution Installation
  • CCTV Installation
  • Access Control System
  • Fire detection and alarm system
  • Structured cabling installation
  • Uninterruptible Power System (UPS)
  • Standby Generator Installation
  • Plumbing and drainage
  • Eight storey office accommodation comprising basement and ground floors for car parking and first to seventh floor for office space. Eighth floor is a restaurant.

    Provided electrical and mechanical services including lifts, standby generator, internet ready telecommunications wiring, Building Automatic System. Air conditioning of the entire building and Closed-Circuit TV System.

    Client: Cortec Systems and Solutions Ltd.

    Status: Awaiting tender action.


    Geothermal complex comprises an administration block with a basement, ground floor, first, second and third floor for office space with external parking lot for 50 vehicles.

    Other facilities outlets, training centre, conference facilities, gym, modern guest houses and a block of 4 No. laboratories.

    Provided the following services:

  • Power and lighting installation.
  • External lighting.
  • Switchboard.
  • Power Distribution.
  • Structured cabling installation
  • CCTV and restricted access control system
  • Plumbing and drainage



  • COMMERCIALS (REFURBISHMENTS):

    Refurbishment of block-C ground and mezzanine floors to house NSSF Hill Branch and Tenant Purchase Scheme offices and additional Hill Branch offices to be created on the first and second floors.

    Common and circulation areas from 3rd to 8th floors including corridors, toilets and kitchenettes are also to be refurbished.

    Provided:

  • Small power and lighting fittings.
  • Medium Power Distribution and Distribution boards.
  • Cable pathways.
  • Medium voltage switchboard.
  • Fire detection and alarm system.
  • Structured Cabling Installation.
  • Sanitary fittings
  • Air conditioning
  • Refuse chute system.
  • New Lifts Installation in Block-C at Social Security House Complex-Nairobi

    An existing and fully functional 7 storey office block with a basement accommodating part of NSSF staff and other Government Ministries.

    The building is serviced by 3 No. lifts that have been operating inefficiently with frequent breakdown.

    New three lifts have been installed including new driving mechanisms and new cars.

    Generator Installation Works at Blocks-A, B & C at Social Security House Complex

    Scope: installation of 2 no x 650 Kva generator sets running in synchrony to support the entire 1.2 MVA load of block-A.

    Other works include relocating of existing 650 kva generator set from block-A to block-B to support both blocks-A & B.

    Electrical Installation Associated with Generator Installation Works at Blocks-A, B & C at Social Security House Complex

    The works are spread in blocks-A, B & C and are further outlined as follows:

    Block "A"

    Terminated cables from new generator sets at the exit from basement 3 to synchronizing switchboard (panel) in switch room. Linked synchronizing panel and change-over panel (auto transfer panel) through 4000 amps, 4 pole copper busbar trunking.

    Main switchboard provided power from generator transfer panel vide 4000 amps, 4 pole copper bus bar trunking suspended from switch room roof slab.

    Other works include installation of new 1 x 1.25MVA transformer, cables and cable ladders.

    Installed new change over panel (automatic transfer panel.)

    Blocks "B" and "C"

    Scope of works in block "B" entailed installation of floor standing 1200 amps, 4 pole copper busbar cubicle synchronizing switch board, provision of change over panels and cabling from the 750 KVA genset to synchronizing panel, from the bus bar to change over switches and final termination to existing switchboards in blocks "B" and "C".

    Other works in block-B include installation of new ring main unit and removal of existing one.


    Refurbishment of existing vehicle show room by stretching building facades and introducing fully glazed walls. Remodeling of customer care and introduction of financing booths and associated facilities.

    Provide:

  • Lighting and power
  • Structured cabling installation
  • Air conditioning system
  • Scope includes provision of electrical and mechanical services to the following facilities: Senate, House of Deputies and External Works.

    Specific works comprises mechanical ventilation and air conditioning, fire detection and alarm system, electrical works, Closed Circuit TV System, Sound Control and Broadcasting System and water treatment works. Proposed external and street lighting installations vide solar power. Prepared estimates and tender documentation.




    MIXED DEVELOPMENT:

    A mixed development comprising of basement parking levels 01 & 02, ground floor subdivided for future letting, first floor parking, mezzanine floor subdivided for subletting, second floor parking, and typical 3rd to 6th floors office suites types A, B, C, D, E and F, typical 7th to 10th floors are two bedroom apartments.

    Provided:

  • Small power and lighting fittings.
  • Medium voltage switchboard and Voltage Stabilizer
  • Power Distribution Installation
  • CCTV Installation
  • Access Control System
  • Fire detection and alarm system
  • Structured cabling installation
  • Building Management System (BMS) installation
  • Plumbing and drainage systems
  • ventilation
  • Located in Naivasha approximately 80 kilometers, north west of Nairobi. Aberdare Hills Golf Resort (AHGR) is a new luxury golf resort with a 120 key boutique hotel, spa, golf clubhouse and 500 no. residential units designed for 2, 3, 4 and 5 bed villas. Comprehensive development of infrastructure to fully service the development.

    The infrastructure involves high and low voltage power distribution, telecommunication services, solar street lighting, centralized LPG system, CCTV installation, comprehensive Building Management System, electric fence, wall vibration sensors and 10 no x 650Kva standby generator supply (operating in synchrony).


    Development comprising ground, first, second, third and fourth floors.

    Ground floor houses shops, supermarket, and theatre and fast food restaurants. Plants rooms such as transformer and switch rooms are also located on ground floor.

    First floor comprises additional shops and bar and restaurant. Second floor is an office accommodation space while third and fourth floors house hotel rooms.

    The project entails installation of lighting and power including lightning protection to the proposed shopping mall.

    Provided:

  • Power and lighting installation.
  • Medium Voltage Switchgears.
  • External lighting.
  • Lightning protection installation.
  • Plumbing and drainage
  • Air conditioning
  • Sanitary fittings
  • A complex comprising lower and mid ground floors for car parking and cinema hall. Plant rooms comprising Medium Voltage Switch room, Main Distribution Frame Room (MDF) and Transformer rooms located on Lower Ground floor.

    Upper ground floor through to second floor comprises shops/offices with a supermarket and a double volume Galleria located on Upper Ground floor. Total built up area is 35,000 square meters.

    Salient features of the project include:

  • Power and lighting installation.
  • High Voltage and Medium Voltage Switchgears-comprising provision of SF6 switchgears and 4000 amps, 4 pole medium voltage switchboard.
  • Transformer Installation-1 x 1.25 MVA
  • External lighting.
  • Lightning protection installation
  • 7 No lifts and 8 No travelators.


  • FIT-OUT:

    Provided electrical and mechanical services for Regional Headquarters offices for AFD in Nairobi.

    Services included lighting and power, structured cabling installation, fire detection and alarm system, access control system, plumbing and drainage.


    Provided electrical and mechanical services for Dubai based chemical company in Nairobi.

    Services include lighting and power installation, restricted access control system and CCTV. Telecommunications structured cabling. Fire detection, alarm and suppression systems


    Located in Nakuru Town the project is a part of an existing development (complex already occupied by other tenants) and was customized as per the banks requirements.

    Provided:

    • Power and lighting installation.
    • Power Distribution.
    • Structured Cabling Installation.
    • Access control system
    • CCTV system
    • Plumbing and drainage
    • Air conditioning system


    LEARNING INSTITUTIONS:

    Located in Kibera, the school undertook to construct a three storey building to house standard one to eight including classrooms and ablution blocks.

    Provided:

    • Lighting and power
    • Fire detection and alarm system
    • Plumbing and drainage
    • Water reticulation
    • Fire-fighting installation
    • Elevated water tank

    Located in Mlolongo off Mombasa Road the project entail construction of Nursery, Primary and Secondary schools within same compound. The project was undertaken in phases as follows:

    • Nursery school
    • Primary school
    • Secondary school

    Provided:

    • Lighting and power
    • Fire detection and alarm system
    • Plumbing and drainage
    • Water reticulation
    • Fire-fighting installation

    Learning complex comprises six floors of classrooms of various sizes and two lecture theaters of 300 students each, a fully-fledged kitchen and cafeteria.

    Works involved

    Electrical:

    • Provision of mechanical and electrical installations
    • Structured cabling
    • Lifts installation
    • Standby generator for the entire facility

    Mechanical:

    • Plumbing and drainage
    • Air conditioning
    • Fire- fighting installation

    A complex comprising two storey Tuition block for 8 classes, Multi- Purpose Hall, Workshops, Dining Hall/Kitchen, 2 No. Dormitories for girls and similar number for boys, staff accommodation for Headmaster and Deputy, Senior Staff, Junior Staff and Subordinate staff.

    Salient features of the project include:

    • Provision of lighting and power.
    • Structured cabling.
    • External power distribution.
    • External lighting.
    • Stand by generator

    This is a complex comprising two storey Tuition block for 8 classes, Multi- Purpose Hall, Workshops, Dining Hall/Kitchen, 1 No. two storey Dormitory for girls and similar number for boys, staff accommodation for Headmaster & Deputy, Senior Staff, Junior Staff and Subordinate staff.

    Salient features of the project include:

    • Provision of lighting and power.
    • Structured cabling.
    • External power distribution.
    • External lighting.
    • Stand by generator


    STREET LIGHTING INSTALLATIONS:

    Carried out the following street lighting projects:

    1. Jommo Kenyatta International Airport (JKIA)-Machakos turn-off-15 Km:
    2. Rehabilitation of Nyamasaria - Kisumu - Kisian (A1/B1) Including Kisumu Bypass Road-15 Km.
    3. Rehabilitation of Kisumu Roads Projects: Oginga Odinga street. Obote road. Nyamasaria-Chirombero. Kakamega road-approx 20 Km.

    Works contract for the above street lighting projects included:

    Design, production of drawings, tender documentation and project administration.

    • Preparation of cost estimates for the electrical works.
    • Tender invitation and evaluation of various bids.
    • Submission of tender report and recommendation for tender award.
    • Site inspections and meetings.
    • Preparation of interim valuation certificates.
    • Advise on anticipated variations to the original contract including causes thereof and impact to the contract in terms of cost and timelines.
    • Testing and commissioning of street lighting.
    • Preparation of as-built drawings in soft and hard copies.
    • Final account.
    • Hand over.
    • Documentation of snag list.
    • Inspection after Defects Liability Period and making good of defects.

    Kenya Informal Settlement Improvement Project (KISIP)-Eldoret

    Funded by the World Bank through the International Development Agencies such as IDA, SIDA, and AFD, the project involved installation of 9 no. high mast lighting systems within Eldoret town’s informal settlements. The masts were distributed as follows: three (3 no.) high in Hill School, 3 no. in Kimumu Hawai, 1 no. in Kimumu Kambi Nairobi, and 2 no. in Racecourse.

    Each high mast was 30m long and carried 9 no. LED Floodlights 400W each and 200W aviation obstruction light on the luminaire carriage assembly. Power distribution to each high mast was provided via appropriately sized feeder pillars and sub main cables. The scope of works included:

    • Power and lighting distribution
    • Street lighting installation
    • Lightning protection


    INDUSTRIAL:

    The equipment’s supplier M/s Haver and Boecker (H & V) prepared comprehensive drawings, Technical Specifications and Bills of Quantities necessary for delivery of the project. The equipment and items supplied by H& V were installed by local contractor under the supervision of both the supplier (H & V) Syldon and Partners.

    Syldon and Partners prepared drawings and tender documents for both electrical and mechanical scope of works:

    Electrical:

    • Lighting and power installation for all the decks namely decks at levels, 0.00, 0.20, 5.00, 13.20 & 20.00
    • Other works at each of these levels includes fire detection and alarm systems
    • Lightning protection installation
    • Power and control cable installation
    • Trunking and cable management systems

    Mechanical:

    • Fire Protection namely: Portable Fire Extinguishers, Hose Reel System and Hydrant System
    • Compressed Air System
    • Mechanical Ventilation and Air Conditioning Installations

    Comprehensive observation of EACCP safety rules and terms of engagement at workplace.


    A new sugar factory based in Kwale (former Ramisi Sugar) with designed cane crushing capacity of 3,500 tons per day (TCD) with co-generation power plant of 20 Megawatt capacity.

    Scope includes plant buildings: Cane Handling and Preparatory Devices, Cane Handling Area Devices and Over Bridges, Cane Crushing Mills, Mill House, Power House, Bagasse Storage Shed and Yard, Diesel Generator House, Raw Sugar Godown, Refined Sugar Godown, electricity Switchyard and Metering Room etc.

    Non-plant buildings include: Office accommodation, laboratories, guest house, and staff houses of all cadres, Kindergarten, Primary and Secondary Schools, Shopping Areas, Recreation Facilities etc


  • Bamburi Cement Ltd has a special products factory in Athi River, from where they (Bamburi) relocated one production line and associated equipment and ancillaries to Mombasa factory at the coast province.

    In terms of electrical installation works most of the installation in Mombasa were new, however, certain equipment such as Block Making Machine and associated electrical elements were relocated and control cabling redone using the existing cables.

    Works included:

    Electrical installation:

  • Power and lighting installation.
  • External and Steet lighting.
  • Panel Boards, Distribution Boards and Consumer Units
  • Medium Voltage Switchboard and Stabilizer
  • Power Distribution.
  • Fire alarm system
  • Structured cabling installation
  • Works in Athi River Plant
  • Mechanical installation:

  • Plumbing and drainage
  • Air conditioning and ventilation
  • Fire- fighting installation
  • Comprehensive observation of Bamburi safety rules and terms of engagement at workplace.

    Located at Industrial Area-Kitui road, Bamburi Cement set up a ready mix plant to meet the local requirements of the clients.

    Works contract comprises

    Electrical:

  • Power and lighting installation to Ready Mix Plant.
  • Electrical installation to Changing rooms.
  • Medium Voltage Switchboard
  • Power Distribution.
  • Fire alarm system
  • Mechanical works:

  • Plumbing and drainage
  • Fire- fighting installation
  • Water tank and booster pumps
  • Comprehensive observation of Bamburi safety rules and terms of engagement at workplace.



    ENERGY:

    Located in Laisamis region of Marsabit, the wind power project is designed for production of 310 MW of green power to be loaded to the national grid. The first phase of 90 MW is to be connected to the national grid by end of 2017. The power plant is the largest in Africa.

    The power produced will be transported through double circuit lines that will connect to the national grid at Suswa. The 430 Km, 400Kv double circuit lines to be constructed by KETRACO will also connect Samburu, Marsabit and Turkana counties to the national grid.

    Scope of work includes:

  • Lot 1: HV transformer room and HV control centers. Provided lighting and power for ancillary use including air conditioning of the control room. Fire detection and alarm system. Provided simulation of lighting levels at all task areas including sub-station lighting at the gantries. Determined essential load to be supported by UPS.
  • Lot 2: MV transformer room and MV control centers. Provided lighting and power for ancillary use including air conditioning of the control room. Fire detection and alarm system. Provided simulation of lighting levels at all task areas including sub-station lighting at the gantries. Determined essential load to be supported by UPS.
  • Provided air conditioning, plumbing works, water reticulation and disposal of foul water.
  • These sites were existing petrol stations which have been out of operation and required rehabilitation of both builders work mechanical and electrical. The sites are located at Sabasaba and Habari.

    Provided:

  • Power and lighting installation.
  • External lighting.
  • Meterbox.
  • Power Distribution.
  • Structured Cabling Installation.
  • Fire detection and alarm system
  • Fuel dispensing equipment
  • Plumbing and drainage
  • Development by Ministry of Regional Development of a multi-purpose dam in Nandi Forest that will among other purposes, provide water for a 50MW hydroelectric power station at the foot of Nandi Hills. The power from the station shall be evacuated through a 37Km line to Muhoroni 132Kv sub-station.

    The scope comprises design and tender documentation for 132Kv line, design and tender documentation for landing bays at the Muhoroni sub-station. Other works include 11Kv and 33Kv line for power needs at the dam. Other specialists involved include Land and Geotechnical Surveyors.

    Client: Ministry of Regional Development Authorities (MoRDA)

    Status: Pre-contract complete

    Carried out comprehensive energy audits and reports including recommendations for the following health facilities for County Government of Kisumu-Kenya:

  • Ahero County Hospital

    Ahero has a total bed capacity of 24 beds. The hospital offers both in and outpatient services.


  • Muhoroni County Hospital

    The hospital is fully owned by the Ministry of Health of Kenya but was later transferred to the county government of Kisumu after devolution of health services. Muhoroni has a total bed capacity of 32 beds and cater for both In and Out-patient services.

  • Nyakach County Hospital

    The hospital was fully owned by the Ministry of health of Kenya but were later transferred to the county government of Kisumu after devolution of health services. Nyakach has a total bed capacity of 20 beds and operates both In and Out-patient services.



  • ONE STOP BORDER POSTS

    Single point border post between Kenya and Ethiopia.

    The below listed facilities on the Kenyan side are duplicated on the Ethiopian side:

  • Main building comprising lower and upper ground floors, first floor and roof level used for offices.
  • Customs offices
  • Immigration booth
  • Impounded goods
  • Warehouse
  • Warehouse
  • Verification building

  • A boarder complex between Rwanda and Burundi comprising main office block and ten residential houses for staff.

    Provided:

  • Lighting and power
  • Structured cabling system
  • Standby generator
  • Plumbing, drainage and sanitary fittings